Customization: | Available |
---|---|
Standard Or Nonstandard: | Standard/Customizable |
Shaft Hole: | 20-117 |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
XL Vibration-Damping Star Coupling for Smooth Conveyor Operations
1.Polyurethane elastomer is limited by a convex claw block, which can avoid the internal deformationcaused by the impact and the external deformation produced by centrifugal force.
2.The large surface of convex claw, which can reduce the pressure on the surface of the involute tooth;
3.Can compensate the relative deviation, buffer, shock absorption, abrasion resistance of the two axles:
4.Be suitable for the connection of transmission shaft for two coaxial lines, which is widely used.
Model | HD | d1,d2Maximum | I1, 12 | E | L | D | Valve number | N.m N.ominal torque | r/min Allowable rotating speed |
XL1 | 38 | 22 | 25.5 | 15 | 66 | 18 | 6 | 20 | 1900 |
XL2 | 53 | 32 | 30.25 | 17.5 | 78 | 28 | 8 | 70 | 1400 |
XL3 | 63 | 35 | 35.5 | 19 | 90 | 30 | 8 | 190 | 11800 |
XL4 | 78 | 42 | 46 | 22 | 114 | 39 | 8 | 380 | 9800 |
XL5 | 93 | 50 | 51 | 24 | 126 | 45 | 8 | 530 | 8000 |
XL6 | 103 | 55 | 57 | 26 | 140 | 51 | 8 | 620 | 7100 |
XL7 | 118 | 65 | 66 | 28 | 160 | 60 | 8 | 820 | 6300 |
XL8 | 135 | 75 | 76.5 | 32 | 185 | 68 | 8 | 1250 | 5600 |
XL9 | 157 | 90 | 87 | 36 | 210 | 80 | 10 | 1950 | 4750 |
Runhe couplings have the following advantages:
1.Efficient Power Transmission
2.Misalignment Compensation
3.Vibration and Shock Absorption
4.Versatility Across Applications
5.Easy Installation and Maintenance
6.Enhanced System Longevity
7.Cost-Effective Performance
Applications
Gear Pump/Motor production line
Hydraulic Cylinder production line
1. How long can it be delivered after placing an order on the platform?
Under normal circumstances, we will ship within 1-3 working days after confirming the order and receiving the payment. If there are special circumstances, we will notify you in time.